International Telecommunication Union   ITU
Français  Espańol
 
Site map Contact Us Print version
  Home : ITU-R : WP1A : Contributions  Recently posted -  Search Meeting Documents
   
ITU-R WP1A  C 

ITU-R WP1A

Spectrum engineering techniques

Results:4 total items.
Contributions  [ Source: WP 8B ]   Documents / Contributions
 
Number 
Title Source Date
[ 166 ]  
 
Liaison statement to WPs 1A and 1C (For informacion to WP 7C) - Future work related to Annex 8 of Recommendation ITU-R SM.1541-2     WP 8B   2007-08-27
[ 106 ]  
 
Liaison statement to Working Parties 1A and 1C - Working party 8B rapporteur and Co-Chairman of JRG-1A/1C/8B     WP 8B   2006-05-01
[ 94 ]  
 
Liaison statement to WPs 1A, 3J, 3K and 3M - Compatibility studies between aeronautical mobile telemetry systems and systems operating under primary radiocommunication services in 4 500-4 800 MHz and 5 925-6 700 MHz bands identified as candidates for further study     WP 8B   2005-09-29
[ 33 ]  
 
Liaison statement to Working Party 1A - Compatibility between radiocommunication systems and high data rate telecommunication systems using electricity power supply or telephone distribution wiring     WP 8B   2004-01-19
Results:4 total items.
 
Multiple Document Download: Check the boxes of the selected documents, then click "Zip and download"
   
 
User preferences: 
Multiple Document Download: Formats and Languages to be included (when available):
HTML Navigation Pages  
Formats  + Other formats
Languages (maximum 2)  + Multilingual 
(E: English - F: French - S: Spanish - A: Arabic - C: Chinese - R: Russian)

Top -  Feedback -  Contact Us -  Copyright © ITU 2008 All Rights Reserved
Contact for this page :  ITU-R Web coordinator
Updated : 2024-5-21